Blog‎ > ‎

What have we been up to in April

posted Apr 30, 2019, 10:26 AM by Josh Warner
April 28, 2019
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.
Woke up to another 5 star review this morning. Friday night right at 6:00 the call came in. Tracy Valentine Terry and I got right on it.












Got this nice little 6x12 porch done for a customer
Kim Valentine Tracy Valentine Carleto Collazo Jim Collazo Che Flores
J L Warner Mobile Home Repair - decks, porches, stairs, steps made to order
J L Warner Mobile Home Repair - decks, porches, stairs, steps made to order
J L Warner Mobile Home Repair - decks, porches, stairs, steps made to order
J L Warner Mobile Home Repair - decks, porches, stairs, steps made to order
J L Warner Mobile Home Repair - decks, porches, stairs, steps made to order
















April 19, 2019
Snuck this little cement job in before the weekend and between the rain thanks to my awesome associates 
Kim Valentine Tracy Valentine Carleto Collazo Jim Collazo Dylan Shearer Hunter Bob
J L Warner cement and concrete repair, driveway and sidewalk installation, site preperation
J L Warner cement and concrete repair, driveway and sidewalk installation, site preperation
J L Warner cement and concrete repair, driveway and sidewalk installation, site preperation
J L Warner cement and concrete repair, driveway and sidewalk installation, site preperation


April 9, 2019
Four other companies came out there and couldn’t find the problem. Well we glad she finally found us. A very slow sewer leak. And poor ol Carleto Collazo gagging up under the home
A slow leak that four others companies could not find



April 2, 2019 - April 5. 2019

Been busier than ever. Water service repair, grading yards, cold patching streets and parking lots.
Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.
Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.
Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.
Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.










Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.
Drain clearing is always a thing in the Spring. But yes we have everything from small snakes for sink drains to a 300ft sewer cleaning jet that can push through clogged sanitary sewer lines underground.











Deck Building
deck building, porches, stairs, steps, mobile home repair
deck buildin, porcheses, stairs, steps, mobile home repair
deck building, porches, stairs, steps, mobile home repair
deck building, porches, stairs, steps, mobile home repair
deck building, porches, stairs, steps, mobile home repair











Still have a lot of floors to do but getting them done
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation
April 2, 2019 - April 5. 2019
April 2, 2019 - April 5. 2019
April 2, 2019 - April 5. 2019







mobile home repair, flood damage repair, water damage repair, new floor, fix floor, floor installation

Comments